
A solar farm can wait longer for its cable than it took to build
Connection queues now decide which projects get built. We followed one 80 megawatt site through four years of studies, three redesigns and one landowner with a very good lawyer.
Longwave is a weekly paper on the power grid, written for the people who keep it standing: planners, operators, traders and the engineers who climb the towers.

Connection queues now decide which projects get built. We followed one 80 megawatt site through four years of studies, three redesigns and one landowner with a very good lawyer.
Batteries sized for the old evening ramp are running out of charge before the new one ends. What operators are changing in their dispatch rules.
A substation inspector walks us through a day of thermal images, and the three faults that only show up at dawn.
The clearing price is the headline. The derating factors underneath it decide who gets paid, and for how many hours.
Eight recent stories, newest first. Every figure links to the document it came from.
Scroll sideways through the archive. Each cover story links to the full issue.

Longwave is written by a desk of six: two former system operators, an energy economist, a planner and two reporters. Every number in print links to the document it came from. When we get one wrong, the fix goes on this page in the same week.
| Date | What we got wrong | The fix |
|---|---|---|
| 12 Nov | Called a 220 kV line a 400 kV line | Corrected in the web and email editions |
| 29 Oct | Mixed megawatts and megawatt hours in a chart label | Chart redrawn, units now in every axis |
| 15 Oct | Named the wrong regulator in a headline | Headline and link updated |
One email a week with the lead story, the three numbers worth knowing and one chart. Free.